Curriculum Vitae
Personal Information
Name |
: Shawky Galal Foda |
Nationality |
: Egyptian. |
Date of Birth |
: 26/8/1968 |
Address in Dubai |
: U.A.E. Dubai, P.O.Box 30036 |
Tel. No. |
: 04- 522660 Ext. 428, Home 652657, 050-6947869 |
Permanent Address |
: 10 Fahmy Street Abbasia, Cairo, Egypt. |
Permanent Tel. No. |
: 002 02 2853725 |
Permanent Fax. No. |
: 1-801 469-3842 |
|
: "[email protected] ". |
Home Page |
|
Martial Status |
: Married |
Education
Qualification |
: 1- B.Sc. in Electronics and Communications-1990 . 2- M.Sc. in Electronics and Communications-1997 |
University |
: Ain Shams University Faculty of engineering (both B.Sc. and M.Sc.) |
Degree |
: Very Good (83.6%) with honor degree |
Gradu. Project |
: Optical Fiber Communication Link |
Experience (Most recent first)
* |
Period |
: 2/1999-Till now |
||||||
|
Organization |
: Gulf Test Factory Services (GTFS)-Bin Zayed Group, Dubai-UAE |
||||||
|
Position |
: Senior Test Engineer |
||||||
|
Duties |
: 1- Developing and executing Test Cases to test Saudi Arabian Telecommunication (STC) Systems 2- Planning and executing a proven methodology for testing software in embedded systems (PLC’s) against the user acceptance criteria. |
||||||
* |
Period |
: From 4/1998 ?2/1999 |
||||||
|
Organization |
: Procter & Gamble, Egypt- Cairo Plant |
||||||
|
Position |
: Project Engineer |
||||||
|
Duties |
: Conducting a complete and extensive Year 2000 Project to protect the manufacturing plant and its industrial components (PLC?s, controllers, quality control programs,?) against failure due to the Year 2000 Problem with the Cooperation of Raytheon Consulting Engineering (England) |
||||||
* |
Period |
: From 8/1996-up to date (as a part time ) |
||||||
|
Organization |
: PeakImage Company |
||||||
|
Position |
: Network Engineer |
||||||
|
Duties |
: Responsible for installation and maintenance of a Windows NT network |
||||||
|
|
|
||||||
* |
Period |
: From 9/1996 To 4/1998 |
||||||
|
Organization |
: Helwan University- Computer and Information collage |
||||||
|
Position |
: Lecturer Assistant |
||||||
|
Duties |
: 1-Head of groups of instructors for many academic subjects (programming Languages, Computer Hardware and Numerical Analysis?) 2-Head of Control Committee for Examinations results and managing the examinations processes |
||||||
|
|
|
||||||
* |
Period |
: From 9/1992 To 8/1996 |
||||||
|
Organization |
: Buraidha technical collage in Kingdom of Saudi Arabia |
||||||
|
Position |
: Electronic engineer |
||||||
|
Duties |
|
||||||
|
|
|
||||||
* |
Period |
: From 8/1991 To 8/1992 |
||||||
|
Organization |
: Arab British Dynamics ABD a subsidiary of Arab Organization for Industrialization-System Engineering Dept. |
||||||
|
Position |
: System Engineer |
||||||
|
Duties |
: Consultation for the industrial process of a analog Computer used to control the guidance system of an earth to earth missile. |
||||||
|
|
|
||||||
* |
Period |
: From 8/1990 To 8/1991 |
||||||
|
Organization |
: Arab British Dynamics ABD a subsidiary of Arab Organization for Industrialization –Production department |
||||||
|
Position |
: Planning engineer |
||||||
|
Duties |
: Designing " process sheet" which describes the manufacturing process of a military products in details |
||||||
|
|
|
||||||
* |
Period |
: From 6/1990-8/1990 |
||||||
|
Organization |
: Sigma Electronics- El-Obour building- Naser City- Cairo-Egypt |
||||||
|
Position |
: Electronic maintenance engineer |
||||||
Duties |
: Installation and maintenance of Un-interruptible Power Supplies (U.P.S) and its associated Control Circuits (Automatic Transfer Switch?) |
Postgraduate Studied Courses
Published papers: